BUNKER SUPPLY · UAE
Bunkers at Fujairah
Fujairah is the largest bunkering hub in the region and ranked fourth in the world in 2025. Fuel is stored at the Fujairah Oil Industry Zone terminals, loaded onto dedicated bunker barges at the oil tanker terminals and delivered to vessels in the Fujairah Anchorage Area.
| Authority | Port of Fujairah (Fujairah Port Authority), which also issues bunker supply licences |
|---|---|
| Delivery | Dedicated bunker barge at the Fujairah Anchorage Area; barges load at Oil Terminal 1 berths reserved for marine gasoil and low-sulphur fuel oil |
| Grades, 2025 sales mix | VLSFO 380 cSt 64% · HSFO 30% · LSMGO 5% · small volumes of 180 cSt VLSFO and 0.50% MGO |
| Volume, 2025 | About 7.3 million tonnes, down 3% on 2024: VLSFO 4.68 Mt, HSFO 2.20 Mt, LSMGO 0.36 Mt |
| Before anchoring | A Fujairah-based local agent and Port Control permission are required |
| Mass flow meters | Used by some suppliers on a voluntary basis; no port mandate found as of this review |
| Bio-blends | B24 delivered here since December 2023 |
How a stem is delivered
A Fujairah stem is a barge job. The receiving vessel anchors in a zone where bunkering is permitted, the supplier's barge loads at the tanker terminal and comes alongside, and figures are agreed on the barge before and after delivery. Some barges also work Khorfakkan, 20 nautical miles to the north, so availability at one affects the other.
The window matters more than anything else in the enquiry. Barges are scheduled against several receivers, and a vessel that misses its slot waits for the next one. State the earliest and latest time the vessel can take fuel, not only the date.
What the port and the UAE require
In all UAE ports a vessel taking fuel above 0.50% sulphur must first submit its IAPP certificate showing an approved scrubber, and the port confirms receipt before delivery (Federal Maritime Administration Circular 11 of 2022).
The UAE maritime administration also publishes circulars banning named suppliers or barges for violations. The desk checks the current list before a stem is put to any supplier.
Volumes in 2026
Monthly sales in 2026 have run well below 2025 levels, and availability by grade has varied from month to month. Treat any stem as subject to confirmation of supply for that window; the desk confirms it with the supplier before coming back with a firm number.
Questions the desk is asked
Can bunkers be delivered at Fujairah by truck or ex-pipe?
Supply to ships at Fujairah is by barge at the anchorage. No published truck or ex-pipe service to ships was found for the port; if a vessel is alongside a terminal, send the berth and the desk asks the suppliers what can be arranged.
Does Fujairah require mass flow meters on bunker barges?
No mandate was found as of this review. Some suppliers fit them voluntarily. If the stem must be on a metered barge, say so in the enquiry and it is put only to suppliers who have one.
What must the enquiry state for an HSFO stem?
The vessel's IAPP certificate showing an approved scrubber, in addition to the usual vessel, quantity, window and payer. UAE rules require the certificate to be received before fuel above 0.50% sulphur is delivered.
Related
Figures on this page are dated where they are given and are for orientation, not a quotation. The desk does not publish prices. Reviewed 12 November 2026.